Forum Replies Created

Viewing 6 posts - 1 through 6 (of 6 total)
  • cgvn
    Posts: 7
    #2154176

    If something falls thru let me know. Thanks again

    cgvn
    Posts: 7
    #2153943

    Ok let me know I could stop out Tuesday if available

    cgvn
    Posts: 7
    #2153917

    I am interested. Are you available today for me to look at it. I happen to be in Mound this morning helping a buddy with some work.

    cgvn
    Posts: 7
    #1160998

    Try northern creek.com they have some deals on ice gear. Mn residents get lower price on otter shelters than the ones posted. Call the number for prices. You have to pick up shelters at factory but saving are pretty nice

    cgvn
    Posts: 7
    #1048033

    you would be hard pressed to find concrete for 100$ a yard. I would think 150$ would be more like it. I would use number 3 or 4 rebar at two foot spacing with a two foot over lap. chair them up with 1.5 inch patio pavers as to keep rebar elevated while placing. saw cut the floor 1/3 depth of the concrete. Say 10ft by 7.5ft if just doing end of shop. After slab is sawed soak down with water and cover with poly, reapply water to keep wet. leave poly on for 7 days. let dry and apply a good sealer. brock white has a number of them. best of luck.

    cgvn
    Posts: 7
    #738560

    just watched video. You guys do a great job at explaining the process. are rainydaze guided ice fishing rates posted on the web? I saw some for winter but it stated a price for follow boat. not sure if that was in refernce to late fall open water

Viewing 6 posts - 1 through 6 (of 6 total)