Hwy 169 North of Aitkin – Major Detour Starts 4/22/24

  • JoeMX1825
    MN
    Posts: 17852
    #2268191

    169 from Wigwam Bay to Garrison also has a road resurfacing project from 4/29-5/3 for those heading up to fish

    Brian Bezanson
    Posts: 118
    #2268284

    Lots of work around routes that locals will take. I.E. take Co 1 out of town, across river & take the Great River Road back to 169 north of 210. Also take the gravel vs GRR to Swatera, hang a rt and get back on 169 south of Hill City.
    County 4 is a good paved road. It was gravel when I lived off it 48 yrs ago.

    lindyrig79
    Forest Lake / Lake Mille Lacs
    Posts: 5797
    #2268415

    36 mil to do that small section of road? Wow. That is a long detour too!

    blackbay
    mn
    Posts: 872
    #2268520

    169 from Wigwam Bay to Garrison also has a road resurfacing project from 4/29-5/3 for those heading up to fish

    The DOT website says 2026 for the work in Garrison. Is this something different.

    JoeMX1825
    MN
    Posts: 17852
    #2268522

    <div class=”d4p-bbt-quote-title”>JoeMX1825 wrote:</div>
    169 from Wigwam Bay to Garrison also has a road resurfacing project from 4/29-5/3 for those heading up to fish

    The DOT website says 2026 for the work in Garrison. Is this something different.

    yes, that’s the big roundabout project at the Y

Viewing 6 posts - 1 through 6 (of 6 total)

You must be logged in to reply to this topic.