We are heading up tomorrow for our 25th year vacation at lake mary heard there is alot of road construction on 94 west to Alexandria and was advised to take a different route. Is this true?
IDO » Forums » Fishing Forums » General Discussion Forum » Heading to Alexandria 494 to 94
Heading to Alexandria 494 to 94
-
uninc4709Posts: 171June 16, 2021 at 1:13 pm #2043029
check out 511mn.org. MnDOT does a decent job keeping this updated. Looks like a fair amount of construction until you make it out of the cities.
June 16, 2021 at 1:22 pm #2043031You’ll be fine, you’re leaving on a Thursday. Maple Grove to Monticello is under major construction in areas but it typically flows pretty smooth.
During any high travel times I’d say find a different route.
AnotherFishermanPosts: 615June 16, 2021 at 1:24 pm #2043032The exchange from 494 to 94 is a nightmare right now. Went to Alexandria last thursday and came upon the construction around 2:30pm. We finally got through i’d guess an hour later.
If I were to go again, I’d head up a different direction then cut over around Albertville or something.
June 16, 2021 at 1:29 pm #204303494 from Maple Grove to Albertville I think is one lane, which is ridiculous. If you’re driving through there during rush hour (2pm or so – 6pm) it will take you about an hour.
June 16, 2021 at 1:33 pm #2043035The exchange from 494 to 94 is a nightmare right now.
This! I work in Minnetonka and live in Maple Grove, and I’ve resigned myself to taking a different route. It’s brutal right now.
On I94 westbound, there is a left-exit just east of the Weaver Lake Rd. exit that will take you to St. Michael. Be aware of it or you will be stuck in the right lanes (unless you plan on exiting prior to St. Michael, in which case you will need to be in the right lanes).
June 16, 2021 at 1:40 pm #2043037The route we have taken in the past and did again just last week heading to Aitkin is 55 west off of 94 to the blacktop that runs north through Corcoran. This will dump you in Rogers. Since you are heading further NW you could probably take 55 a little longer.
June 16, 2021 at 1:51 pm #2043038If I take 55 at Plymouth to 25 and hit 94 at Monticello will that be safe
June 16, 2021 at 1:57 pm #204304055 west to Buffalo then 25 north to 94W would be alright.
x3, but can we delete this thread now that Craig has his directions? We don’t need everyone going that way…
deertrackerPosts: 9253June 16, 2021 at 2:01 pm #2043041<div class=”d4p-bbt-quote-title”>Ralph Wiggum wrote:</div>
55 west to Buffalo then 25 north to 94W would be alright.x3, but can we delete this thread now that Craig has his directions? We don’t need everyone going that way…
Also don’t need all these people finding Alexandria…
DTJune 16, 2021 at 2:24 pm #2043048x3, but can we delete this thread now that Craig has his directions? We don’t need everyone going that way…
Good point. One of the best parts of our cabin is that it’s straight west so I normally avoid I94.:)
June 16, 2021 at 2:42 pm #2043050Can I ask if anyone even knows what they’re doing to 94 in Maple Grove? Putting a median barrier in? The actual road surface seemed pretty good to me and there doesn’t appear to be enough room to add another lane…
June 16, 2021 at 2:51 pm #2043052Can I ask if anyone even knows what they’re doing to 94 in Maple Grove? Putting a median barrier in? The actual road surface seemed pretty good to me and there doesn’t appear to be enough room to add another lane…
Good question. I know they’re putting a third lane in between St Michael and Albertville, but they should have thought ahead and completed that a few years back when they put the third lane in between Rogers and St Michael.
I think they’re doing something with that exit ramp at St Michael too. It gets so far backed up now that vehicles are almost sitting on 94 waiting to exit. Again, they should have thought about that during the last construction project on 94 in St Michael.
June 16, 2021 at 3:04 pm #2043054I can tell pretty easily that the eastbound side going from Rogers to Maple Grove is pretty much done. Its brand new concrete and a new asphalt shoulder. During the winter it was pretty much wide open and smooth sailing. Maybe they are finishing the west bound side this summer?
June 16, 2021 at 3:26 pm #2043058Use google maps on your phone! It will tell you the fastest time to your destination and route you around any very slow areas.
They have loads of data from moving phones all along roads.
In my experience it is rarely off by more than a couple minutes and I use it very often.
June 16, 2021 at 3:28 pm #2043060Use google maps on your phone
Be careful about that as its against the law to actually hold your phone while you’re driving, not to mention how unsafe it is using an application to find a better route on google maps. You need a hands-free way to do this sort of thing unless you have a passenger that can do it.
June 16, 2021 at 3:43 pm #2043061Can I ask if anyone even knows what they’re doing to 94 in Maple Grove? Putting a median barrier in? The actual road surface seemed pretty good to me and there doesn’t appear to be enough room to add another lane…
They’re adding more lanes from Maple Grove to St Cloud and doing it in stages that are supposed to take 2 years each to complete.
June 16, 2021 at 3:58 pm #2043064<div class=”d4p-bbt-quote-title”>gimruis wrote:</div>
Can I ask if anyone even knows what they’re doing to 94 in Maple Grove? Putting a median barrier in? The actual road surface seemed pretty good to me and there doesn’t appear to be enough room to add another lane…They’re adding more lanes from Maple Grove to St Cloud and doing it in stages that are supposed to take 2 years each to complete.
??hmm… Have only heard they’re adding a third lane between St Michael and Albertville.
June 16, 2021 at 4:08 pm #2043069Here is all the info: I94 Project
Summary of work:
Reconstruct roads
9 miles between Maple Grove and Rogers (2020-2021)
6 miles between St. Michael and Albertville (2019-2021)
15 miles between Monticello and Clearwater (2019-2021)Add lanes
Add a lane on I-94 in both directions between Hwy 610 in Maple Grove and Hwy 101 in Rogers (total of four each way)
Add a lane on WB I-94 between Hwy 241 in St. Michael and Wright Co. Rd. 37 in Albertville and add a lane on EB I-94 between Hwy 241 in St. Michael and Wright Co. Rd. 19 in Albertville (total of three each way)
Add a lane on I-94 in both directions between Hwy 25 in Monticello and Hwy 24 in Clearwater (total of three each way)Build interchanges and construct bridges
Build a diverging diamond interchange, trails and sidewalks southeast of Brockton Ln. in Dayton
Replace Hwy 241 bridge over I-94 in St. Michael and improve access
Construct roundabout at Hwy 241 and O’Day Ave. in St. Michael
Replace I-94 bridges over Co. Rd. 19 in Albertville and improve accessAdd freight improvements
Add 10 parking spaces in Elm Creek Rest Area
Install digital signage system with real-time availability of Elm Creek Rest Area spaces
Improve the parking lot and sidewalks at the Enfield Rest Area
Improve and increase lanes for smoother merging and exitingJune 16, 2021 at 5:17 pm #2043081Thanks Ralph guess that pretty much clears it up. 4 lanes between 610 and Rogers each direction.
June 16, 2021 at 9:58 pm #2043114Just as an indicator of how many people are following what there GPS tells them and avoiding 94W at Maple Grove.
Yeah, I believe that. We generally run back roads from our place in MG out to Buffalo, and there’s even been more Friday traffic on those roads this summer, and 55 is busy well west of Buffalo, which is unusual.
You must be logged in to reply to this topic.