We made the decision to replace all of our sheetrock in the basement as a result of flood damage. I\\\’m in the process of getting the old rock out of there and should be ready for mud, tape, and texture sometime next week. I\\\’m planning to hang the rock over the weekend. I\\\’ll do some measuring tonight but a rough idea of what I have is, two average size bedrooms, and a fairly large family room with a small 4×4 hallway. I\\\’m leaving the ceilings, but will need to have them textured to match the walls. If anyone is interested in the mud, tape , and texture job please let me know. I\\\’m on a bit of a time crunch here, my wife needs the basement to run her daycare.
Thanks,
Matt