I have a 6 month lab that is doing well. He can (most of the time) run to a marked and unmarked pile (50 yds) and do line drills with dummies placed at 30-40-50 yds. He runs along a tree row to help the line. Does anyone have any other helpful drills or should I just gradually extent the ranges and fade the tree row and marked pile? Thanks!
Drills for getting lab to run a straight line?
Viewing 1 post (of 1 total)
You must be logged in to reply to this topic.