Plumber cut 30”x 21” hole in garage floor to rough in for toilet. Floor is 6”. Plan to mix concrete in wheelbarrow tomorrow and patch cutout. Looks pretty straight forward but haven’t done before. Any tips appreciated.
Any advice patching concrete cutout.
Viewing 8 posts - 1 through 8 (of 8 total)
You must be logged in to reply to this topic.